The first deliverable

The planning binder, tab by tab

Before you sign a build agreement, you get a binder. It is the plan, the schedule and the budget for your house, in one place you can read at your own pace.

It is a paid planning phase with its own short agreement. The agreement says what the fee covers, whether it is credited toward the build, and that the binder is yours either way.

You receive

  • A printed binder and a digital copy

  • A review meeting with the people who wrote it

  • A proposed maximum price, with the terms beside it

Rolled plans with an architect's scale ruler on a workbench

Inside

Six tabs, in the order you read them

1. The house and the lot

What we measured, what we opened and what we found.

  • Measured drawings of the house as it stands

  • Notes on the foundation, framing, roof and systems

  • Lot limits: setbacks, height and impervious cover

  • Protected trees, where there are any

2. The scope

In plain sentences, room by room.

  • What changes and what stays

  • What is not included, named one by one

  • The pre-1978 check and what it means for the work

3. The drawings

The set the permit office and the builders will use.

  • Floor plans and elevations

  • Structural notes from the engineer

  • Electrical, plumbing and air-conditioning layout

4. The selections book

Every finish and fixture, with its allowance.

  • Cabinets, counters, tile, floors and paint

  • Plumbing fixtures, lighting and appliances

  • Lead times, so long orders can start early

5. The schedule

The project in weeks.

  • Permit review and the orders that wait on it

  • When rooms and utilities go out of use

  • The day the walk-through happens

6. The budget and the cap

Line by line, with the cap on top.

  • Cost of the work by trade, with allowances

  • Contingency, and what it's for

  • Our fee, and the proposed guaranteed maximum price

After the review

What you can do with it

  • Build with us

    The build agreement carries the maximum price from tab 6, and the same drawings and selections.

  • Ask another builder to price it

    The drawings and the scope are complete enough for another firm to bid on the same house.

  • Wait

    Many people take the binder home for a season. We update it if the house or the plan changes.

Questions

About the binder

Why does it cost money?

Because it is real work: a survey, drawings, an estimate. Charging for it keeps the binder honest, since it isn't a sales pitch for a build.

How long does it take?

It depends on the size of the house and the scope. We give you a date when we sign the planning agreement.

Is the fee credited if I build with you?

That is set out in the planning agreement before you sign it. Ask at the first conversation.

What if we change the plan afterward?

The binder is updated, and the price follows. The agreement says how.

Want a binder for your house?

Start with a conversation. We'll tell you what the binder would cover for the house you have.